免费看h,国产日韩精品欧美一区灰,日韩中文字幕免费观看,99久久精品国内,韩国美女mv视频歌曲,永久美女视频免费看,长指甲美女视频

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Located in wedbank coalfield, South Africa, Kral coal mine invested in the construction of a 3.0mt/a dry coal preparation plant in 2010 to separate No. 2 thermal coal. The ash content of raw coal is 40.4%, the ash content of cleaned coal after beneficiation is 30.6%, and the recovery rate is 85%. It is mainly sold to power plants. The dry separation plant has an hourly processing capacity of 500 tons and an annual operation of 6000 hours. It has the advantages of short investment payback period, low operation cost and high recovery rate.

KRAL COAL MINE

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE